• GRL Engineers
  • Find PDI Representative
  • Find Authorized Calibration Center
  • Language
  • FAQs
  • Reference Papers
  • English
    • Español (Spanish)
  • Home
  • General
  • Guides
  • Reviews
  • News
  • Request A Quote
  • Find An Event
  • About Us
    • Leadership
    • Sales Team
    • Driving Formulas: From Static Testing to Dynamic Testing Solutions
    • Careers
  • Products
    • All PDI Products
    • ACIP/CFA & DD Piles
      • ATLAS™ Secure Cloud Services
      • Thermal Integrity Profiler (TIP™)
      • Pile Driving Analyzer® (PDA)
      • Case Pile Wave Analysis Program (CAPWAP®)
      • Pile Integrity Tester (PIT)
      • Pile Installation Recorder (PIR)
    • Drilled Shafts & Bored Piles
      • ATLAS™ Secure Cloud Services
      • Thermal Integrity Profiler (TIP™)
      • Thermal Aggregator (TAG) and Thermal Acquisition Port (TAP-Edge)
      • Shaft Area Profile Evaluator (SHAPE®)
      • Shaft Quantitative Inspection Device (SQUID™)
      • Pile Driving Analyzer® (PDA)
      • PDA-DLT Software Add-On
      • Top Force Transducer
      • Case Pile Wave Analysis Program (CAPWAP®)
      • Cross Hole Analyzer (CHAMP)
      • PDI TOMO 3D Tomographic Software
    • Driven Piles
      • ATLAS™ Secure Cloud Services
      • Pile Driving Analyzer® (PDA)
      • GRLWEAP14 Wave Equation Analysis
      • Case Pile Wave Analysis Program (CAPWAP®)
      • Saximeter-Q (SAX-Q)
      • E-Saximeter (E-SAX)
      • Length Inductive Test Equipment (LITE)
    • Other Foundations & Applications
      • ATLAS™ Secure Cloud Services
      • Thermal Integrity Profiler (TIP™)
      • Shaft Area Profile Evaluator (SHAPE®)
      • Pile Driving Analyzer® (PDA)
      • Pile Integrity Tester (PIT)
      • SPT Analyzer
      • Thermal Evaluation of Mass Pours (TEMP)
  • News & Events
    • Events
    • News
    • Newsletters
  • Resources
    • Calibration Library
      • Calibration Library
    • Reference Papers
      • Reference Papers
    • Brochures & Specifications
      • Brochures
      • Sample Specifications
      • Technical Specifications
    • Software
      • Current Software Versions
      • Software Demos
      • SiteLink Technology
    • Training & Education
      • Training Credits
      • Training Webinars
      • PDA Proficiency Test
      • Product/How To Videos
    • FAQs
    • Case Studies
  • Contact Us
    • Request A Quote
    • Find An Event
  • Leadership
  • Sales Team
  • Driving Formulas: From Static Testing to Dynamic Testing Solutions
  • Careers
Hudbay’s New Britannia mill produces first gold

Career Opportunities

  • All PDI Products
  • Solutions for ACIP/CFA & DD Piles
  • Solutions for Drilled Shafts & Bored Piles
  • Solutions for Driven Piles
  • Other Foundations & Applications
  • ATLAS™ Secure Cloud Services
  • Thermal Integrity Profiler (TIP™)
  • Pile Driving Analyzer® (PDA)
  • Case Pile Wave Analysis Program (CAPWAP®)
  • Pile Integrity Tester (PIT)
  • Pile Installation Recorder (PIR)
  • See All
  • ATLAS™ Secure Cloud Services
  • Thermal Integrity Profiler (TIP™)
  • Thermal Aggregator (TAG) and Thermal Acquisition Port (TAP-Edge)
  • Shaft Area Profile Evaluator (SHAPE®)
  • Shaft Quantitative Inspection Device (SQUID™)
  • Pile Driving Analyzer® (PDA)
  • PDA-DLT Software Add-On
  • Top Force Transducer
  • Case Pile Wave Analysis Program (CAPWAP®)
  • Cross Hole Analyzer (CHAMP)
  • PDI TOMO 3D Tomographic Software
  • See All
  • ATLAS™ Secure Cloud Services
  • Pile Driving Analyzer® (PDA)
  • GRLWEAP14 Wave Equation Analysis
  • Case Pile Wave Analysis Program (CAPWAP®)
  • Saximeter-Q (SAX-Q)
  • E-Saximeter (E-SAX)
  • Length Inductive Test Equipment (LITE)
  • See All
  • ATLAS™ Secure Cloud Services
  • Thermal Integrity Profiler (TIP™)
  • Shaft Area Profile Evaluator (SHAPE®)
  • Pile Driving Analyzer® (PDA)
  • Pile Integrity Tester (PIT)
  • SPT Analyzer
  • Thermal Evaluation of Mass Pours (TEMP)
  • See All
Hudbay’s New Britannia mill produces first gold

ATLAS™ Secure Cloud Services

A New Way to Manage Projects

  • Events
  • News
  • Newsletters
Hudbay’s New Britannia mill produces first gold

Newsletter 115

Read Now

  • Calibration Library
  • Reference Papers
  • Brochures & Specifications
  • Software
  • Training & Education
  • FAQs
  • Case Studies
  • Brochures
  • Sample Specifications
  • Technical Specifications
  • Current Software Versions
  • Software Demos
  • SiteLink Technology
  • Training Credits
  • Training Webinars
  • PDA Proficiency Test
  • Product/How To Videos
Hudbay’s New Britannia mill produces first gold

How To Videos

Home | Hudbay’s New Britannia mill produces first gold | Hudbay’s New Britannia mill produces first gold

First Gold - Hudbayвђ™s New Britannia Mill Produces

Hudbay Minerals achieved its first gold production at the refurbished in Snow Lake, Manitoba, on August 11, 2021 . This milestone, completed ahead of the original year-end schedule, marked the formal transition of the nearby Lalor mine into a primary gold operation. Strategic Significance and Refurbishment

A new copper flotation facility was also integrated, which ramped up in late 2021. Production Impact and Growth Hudbay’s New Britannia mill produces first gold

Bringing the New Britannia mill online allowed Hudbay to significantly boost annual output from its Snow Lake operations. Hudbay achieves first gold production at New Britannia mill Hudbay Minerals achieved its first gold production at

Installation of new crushers, a screen deck, flotation circuits, and a new flotation building. on August 11

Designed with a processing capacity of 1,500 tonnes per day (tpd) .

Hudbay Minerals achieved its first gold production at the refurbished in Snow Lake, Manitoba, on August 11, 2021 . This milestone, completed ahead of the original year-end schedule, marked the formal transition of the nearby Lalor mine into a primary gold operation. Strategic Significance and Refurbishment

A new copper flotation facility was also integrated, which ramped up in late 2021. Production Impact and Growth

Bringing the New Britannia mill online allowed Hudbay to significantly boost annual output from its Snow Lake operations. Hudbay achieves first gold production at New Britannia mill

Installation of new crushers, a screen deck, flotation circuits, and a new flotation building.

Designed with a processing capacity of 1,500 tonnes per day (tpd) .

%!s(int=2026) © %!d(string=Iconic River)